Winter Waterproofing Tips | Cold Weather, Key Points for Winter Waterproofing Work

Publish Date: 2025-11-27 0Views
Winter Waterproofing Tips | Cold Weather, Key Points for Winter Waterproofing Work
With the arrival of winter solstice, cold weather comes faster than ever.

Temperatures are dropping sharply.

The sky is overcast and damp.

The sun has already turned into a 'lazy' one.

As the saying goes, 'search everywhere for him, rummage through cabinets to find his coat.'

Facing low temperatures and harsh conditions,

we humans feel cold too, and waterproof materials are no exception.

Significant temperature drops have a major impact on waterproofing work.

Especially for outdoor construction.

What are the key points to pay attention to when doing winter waterproofing?



图片

All waterproof materials from Jin Xin Waterproof Group have undergone strict low-temperature performance testing. As long as they are not damaged during transportation and storage, their quality remains unaffected.


图片

图片
图片


Next up,

let’s briefly introduce

Key considerations for winter waterproofing work.


01
Product Storage
图片

Winter's extreme cold makes product storage particularly critical. Dry powder products are especially prone to moisture absorption, while liquid components in waterproof materials may freeze and deteriorate at low temperatures. Therefore, ensuring products safely pass through winter is essential. Key measures include:

1. Store products in a warm, dry place. Warehouses must be free of standing water or leaks. If possible, install moisture barriers.

2. In extremely cold areas such as underground warehouses, consider using heating systems. For other areas, use insulation materials like straw mats or foam boards to cover or isolate products.

图片


图片

图片

图片


02
Winter Waterproofing Requires Careful Application
图片

In addition to necessary cleaning and repair, thoroughly inspect the base surface for structural defects. Check for cracks, holes, joints, and pipe edges around upper and lower water pipes. Use sealant (Jin Xin sealant) to fill and smooth gaps. Remove debris from sharp edges and ridges. For uneven surfaces with many holes, apply waterproof coating evenly and level it out. Create rounded corners at angles and joints.

Application Method: Apply coating in order from top to bottom and left to right. Ensure the coating thickness matches the recommended usage rate. Winter application requires careful control to avoid excessive thickness, which can cause uneven drying and cracking. Additionally, if the slurry is too thick or unevenly mixed, it may form lumps or bubbles.

图片


图片

03
Reduce Water Content During Application
图片

When the base is overly dry or has high evaporation rates, some water may be needed during application. However, in winter, ambient temperatures are low, and evaporation is minimal. Thus, water content should be reduced compared to summer. To prevent the waterproof material from drying too slowly, reduce the amount of water used while keeping the base dry. Perform work in two stages: first wet, then dry.

图片


图片

图片

图片


04
Use of Sealant Products – Important Notes
图片

Jin Xin sealant is a fast-setting, high-strength dry powder product highly sensitive to construction environment temperature, humidity, and water content. Special attention is required during winter work.

Due to longer curing times in winter, adjust by reducing mixing water and application amounts to ensure smooth progress. Using warm water (or hot water) to mix the material can significantly speed up curing time and improve early strength.

图片


图片

图片


图片


05
Continuous Curing
图片

For newly applied polymer-modified cementitious waterproof coatings like Jin Xin Polymer Waterproof SlurryDuring applicationAfter the coating sets, begin curing. In winter, clean the surface 1–3 times daily (avoid freezing). Cure continuously for 1–2 days. After 48 hours, under non-freezing conditions, a 24-hour water test can be conducted.

图片



图片
图片
Jin Xin Polymer Modified Cementitious Waterproof Slurry



06
Best Time for Construction
图片

Do not perform waterproofing work when ambient temperature remains below 5°C for more than 48 consecutive hours. If absolutely necessary, schedule work between 10:00 AM and 3:00 PM on sunny days, and use warm (or hot) water to mix materials and accelerate construction. Avoid freezing for at least 48 hours after completion. Prevent low temperatures during the curing period that could lead to poor curing or cracking.

图片



In summary,

Winter waterproofing work

requires careful attention to the above details.

Additionally, cold winds bring chill and drafts, just like broken glass.

Please pay attention to insulation and protection.

Avoid being caught off guard by cold drafts and wind!

See you next time!


Latest News

Official Account

Chengdu:Huaqiao City, Jinniu District, Chengdu, Sichuan Province•Creative CenterABuilding 21, Floor 21   Manufacturing Base:No. 56 Xingye 7th Road, Industrial Economic Development Zone, Dayi County, Chengdu, Sichuan Province

Chongqing:Fujia No. 176, Haier Road, Jiangbei District, Chongqing68号   Manufacturing Base:No. 289 Qingsong Road, Tianjia Industrial Park, Tongnan District, Chongqing

National Consultation Hotline

028-87341118或15228990208

After-sales Service

400-0789-166

Copyright@ 2023 Sichuan Jinxing Waterproof Technology Group Co., Ltd. ShuICPBeian No. 2023005631-1

Baidu Baijiahao

Official Douyin

Mini Program Entry

15228990208