NEWS
News & Information
After long-term exposure to air,
it does not harden, nor dissolves in water,
high adhesion strength, suitable for complex construction surfaces,
and can automatically locate and repair damaged waterproof layers at leak points.
Combined with self-adhesive waterproof membrane,
one-day bonding, long-term reliability!
Today, let's take a look,
Non-cement, non-hardening acrylic waterproof coating + self-adhesive membrane, installation method!
New product — JX370 Non-cement, Non-hardening Acrylic Waterproof Coating, made from acrylics, tree resins, and various additives as a 'non-cement-based' waterproof coating. The product contains no cement, with stable and reliable performance, representing a new generation of environmentally friendly waterproof material. Long-term waterproofing, free of solvents, fully meeting national safety and environmental protection requirements.
Unique red-colored high-molecular tree resin, environmentally friendly without cement;
Excellent flexibility and elongation, strong substrate adaptability;
Outstanding chemical resistance, aging resistance, and self-healing capability;
Forms a 'skin-like' bond with the membrane, enhancing overall integrity and allowing higher design standards for waterproofing;
Excellent heat and low-temperature resistance, super strong adhesion strength;
Good workability.
Non-cement, non-hardening acrylic waterproof coating + self-adhesive membrane,
Installation method,
Base inspection — Base cleaning — Applying base treatment compound — Spot application of non-cement, non-hardening acrylic waterproof coating, Reinforcement layer, (One coat, three applications) — Apply (brush or roll) non-cement, non-hardening acrylic waterproof coating on joints — Simultaneous installation of JX103 non-cement high-molecular fiber-based self-adhesive waterproof membrane — Membrane body lamination — Sealing the edge — On-site self-inspection — Quality inspection — Product protection,
The base surface should be solid, flat, dry, clean, and free of oil stains or contaminants.
Apply the base treatment compound evenly on a qualified base surface. Before coating, ensure the compound is thoroughly mixed. During application, apply evenly, avoiding sagging or pooling. Follow the principle of high before low, vertical before horizontal. When the base treatment compound dries, proceed with laying the self-adhesive membrane immediately.
Pre-treat corners, transitions between horizontal and vertical surfaces, etc., by applying coating first. The thickness should be about 2mm. Then shape the membrane to match the contour and lay it accordingly. After completing the reinforcement layer, proceed with full-surface installation, ensuring consistent thickness across the entire waterproof layer.
Before application, preheat the coating. Wait until the entire coating reaches a spreadable state (160°C), then apply the non-cement, non-hardening acrylic waterproof coating evenly using brushing or rolling methods on the base surface. Immediately after brushing, lay the non-cement high-molecular fiber-based self-adhesive waterproof membrane.
Remove the protective film from the underside of the self-adhesive membrane. Lay the membrane onto the applied waterproof coating, then lightly brush the surface of the membrane to expel internal air, ensuring the membrane adheres firmly to the coating. waterproof coating, forming a seamless bond together. waterproof coating, forming a seamless bond together. Together.
During lapping, non-cement high-molecular fiber-based self-adhesive waterproof membrane the lap width should not be less than 80mm (different types of membranes follow their respective installation specifications). After lapping, use a roller to press down firmly to ensure bonding strength.
Seal the membrane edges with metal clamps and steel nails, then apply sealant. Proceed with post-installation self-inspection — quality inspection — product protection work.
Latest News
Official Account
Chengdu:Huaqiao City, Jinniu District, Chengdu, Sichuan Province•Creative CenterABuilding 21, Floor 21 Manufacturing Base:No. 56 Xingye 7th Road, Industrial Economic Development Zone, Dayi County, Chengdu, Sichuan Province
Chongqing:Fujia No. 176, Haier Road, Jiangbei District, Chongqing68号 Manufacturing Base:No. 289 Qingsong Road, Tianjia Industrial Park, Tongnan District, Chongqing
National Consultation Hotline
028-87341118或15228990208
After-sales Service
400-0789-166
Copyright@ 2023 Sichuan Jinxing Waterproof Technology Group Co., Ltd. ShuICPBeian No. 2023005631-1
Baidu Baijiahao
Official Douyin
Mini Program Entry
15228990208