Cold Weather, Winter Waterproofing Work Precautions

Publish Date: 2023-11-17 3Views
Cold Weather, Winter Waterproofing Work Precautions
After the Start of Winter Solstice, winter days come faster and faster.

Temperature drops sharply.

Cold winds blow without mercy.

Gray skies bring more frequent light snow showers.

Feel the winter atmosphere rising to the rooftop.

This heart-piercing chill is simply unbearable!


图片


As the saying goes: 'Search high and low for him, turn over every corner to find his shoes.'

Facing low temperatures and cold weather.

We’re all feeling the cold, and waterproof materials are no exception.

Significant temperature drops have a major impact on waterproofing construction.

Especially for outdoor work.

What precautions should be taken during winter waterproofing construction?



图片

All waterproof materials from JinXing Waterproof Group have passed strict low-temperature performance tests. As long as they are not damaged during transportation and storage, their quality remains unaffected.


图片

图片
图片


Next up:

Let’s briefly introduce some key points for you.

Winter Waterproofing Construction Precautions.


01
Product Storage
图片

Winter is extremely cold, so proper product storage is crucial. Especially dry powder products are highly prone to moisture absorption, while liquid components in waterproof materials may freeze and crack at low temperatures. Therefore, ensure products safely pass through winter with the following measures:

1. Store products in a dry, warm, and well-ventilated area. Warehouses must not have standing water or leaks. If possible, install moisture-proof barriers.

2. In particularly cold areas such as underground rooms or basements, consider installing heating systems. For other areas, use insulation materials like felt blankets or straw mats to wrap or isolate products for thermal protection.

图片

图片

02
Winter Waterproofing Work Requires Thorough Application
图片

Before applying waterproof coatings, in addition to necessary cleaning and repair, carefully inspect for structural defects. Address cracks, holes, seams, and pipe edges around upper and lower water pipes using sealant materials (JinXing Sealant) to fill gaps and level surfaces. Remove any loose debris or protrusions at joints. For areas with many holes, apply waterproof coating evenly and smooth it out. Round off corners and joints into rounded angles.

Application Method: Apply coating in order from top to bottom and left to right. Ensure the coating thickness matches the recommended application rate. Winter work requires thorough application to prevent excessive thickness, which can cause uneven drying and cracking. Also avoid overly thin or uneven application, which may lead to powder formation or bubbling.

图片


图片

03
Reduce Water Content During Application
图片

When the substrate is too dry or has high evaporation, a moderate amount of water is needed when mixing waterproof coatings. However, in winter, ambient temperatures are very low, and evaporation is minimal. Thus, the required water content differs significantly from summer. To avoid prolonged drying times, reduce the amount of water added slightly, ensuring the surface remains free of standing water. Apply in alternating wet-dry sections for better control.

图片


图片


04
Use of Sealing Products – Important Notes
图片

JinXing sealing materials are fast-setting, high-strength dry powder products highly sensitive to construction environment temperature, humidity, and water content. Therefore, extra attention is required during winter construction.

Due to slower curing time in winter compared to summer, appropriately reduce the amount of mixing water and application frequency to ensure smooth progress. Using warm water can accelerate curing, shorten setting time, and improve early strength.

图片


05
Continuous Curing
图片

For newly applied polymer-modified cementitious waterproof coatings like JinXing Polymer Waterproof SlurryDuringconstruction, once the coating has set, begin curing immediately. In winter, clean the surface 1–3 times daily (avoid freezing). Curing should last 1–2 days. After 48 hours, under non-freezing conditions, a 24-hour water retention test can be conducted.

图片



图片
图片
JinXing Polymer Modified Cementitious Waterproof Slurry



06
Best Time for Construction
图片

Avoid construction if ambient temperature stays below 5°C for over 48 consecutive hours. If unavoidable, schedule work between 10:00 AM and 3:00 PM on sunny days, and use warm (or hot) water to mix materials and speed up application. Within 48 hours after work, avoid freezing conditions to prevent poor curing, cracking, or damage.

图片


In summary,

Winter waterproofing construction

requires attention to the above detailed points.

Additionally, cold air brings dampness and chill.

Everyone should pay attention to keeping warm—don’t let yourself get caught in ‘winter clothes’! ~

See you next time!


Latest News

Official Account

Chengdu:Huaqiao City, Jinniu District, Chengdu, Sichuan Province•Creative CenterABuilding 21, Floor 21   Manufacturing Base:No. 56 Xingye 7th Road, Industrial Economic Development Zone, Dayi County, Chengdu, Sichuan Province

Chongqing:Fujia No. 176, Haier Road, Jiangbei District, Chongqing68号   Manufacturing Base:No. 289 Qingsong Road, Tianjia Industrial Park, Tongnan District, Chongqing

National Consultation Hotline

028-87341118或15228990208

After-sales Service

400-0789-166

Copyright@ 2023 Sichuan Jinxing Waterproof Technology Group Co., Ltd. ShuICPBeian No. 2023005631-1

Baidu Baijiahao

Official Douyin

Mini Program Entry

15228990208